A large fireplace at the gable end will be replaced with a smaller Rumford style fire box using the existing chimney. A post and beam system support the chimney while the fireplace is demoed. Restoration of the timber frame begins. A sewer ejector is installed in the basement. The steel ridge beam which will support the new ell is prepped for install. Kevin O'Connor goes on a clamming excursion.